Power interruption
Loss of critical load at a data center
Power quality measurements were collected during testing to evaluate why generators could not sustain critical loads.
Scope: Forensic engineering and review of test data.
Selected historical examples of engineering and forensic work. The descriptions focus on the technical assignment.
Power interruption
Power quality measurements were collected during testing to evaluate why generators could not sustain critical loads.
Scope: Forensic engineering and review of test data.
Emergency power performance
Generator startup was evaluated against the required response time in coordination with the testing agency and engineer of record.
Scope: Technical review and recommendations.
Electrical design evaluation
Historical design information and duct bank heat calculations were reviewed to assess the electrical distribution design.
Scope: Engineering calculations and design review.